
Oil Cooling Plant Type 1.1MW
Contact Now
- TEL:0086-21-35324169
- FAX:0086-21-35324166
- Email:sales@shenglintec.com
- WhatsApp:0086 13916147965
- Mob:0086 13916147965
Introduction
This system is designed for high-efficiency immersion cooling applications and features the following components and deployment requirements:
Modular Design:
Includes two main modules:
· Immersion oil cooling tank
· Coolant Distribution Unit (CDU)
These are connected in the plant room and linked to an outdoor dry cooler.
Factory Prefabricated:
All structures are pre-assembled and fully tested before delivery, ensuring quality and quick on-site deployment.
Flexible Deployment:
Suitable for installation in factory buildings with a level concrete surface or custom foundation.
Site Requirements:
· Access to main power supply
· Connection to a cooling tower
· Network access
These allow for fast and flexible setup.
Number of Miners |
192×M66;120×S21 XP Imm |
Heat Dissipation |
1.1MW |
Flow Rate |
150m³/h (Oil);160m³/h(Water) |
Inlet and Outlet Temperature |
61.6℃/54.46℃ (Oil);57.5℃/51.5℃ (Water) |
Cooler |
Dry Cooler |
Power Supply |
3*380V/3*415V/3*480V, 50/60Hz |
Power Distribution Unit |
Smart PDU |
- 01 Feb,2024Dry Cooler D4-8x910 In Stock Is On Sale! Discount!
- 06 Sep,2023Pad Adiabatic Dry Cooler Trial Operation Before Shipment
- 06 Sep,2023828kW Adiabatic Cooling System Dry Cooler Loading
- 17 Aug,2022Flat Type Dry Cooler Finished For Canada Client
- 06 Sep,20231061kW dry cooler loading for USA client
- 31 Mar,2021Peru client Install Shenglin Adiabatic Dry Cooler At Site